Description:
The DIGDOG is a hand fed trommel concentrator, perfect for sampling. DIGDOG will be released early May 2026, light, portable, and the DIGDOG will have multiple variants. Included attachment options are, clay buster as shown in diagram, open ended trommel, and high banker. All variants will quickly attach to the same sluice concept, stay tuned for YouTube links in May 2026
Description:
10 cubic m/hour Processing power. Utilising BME wet/dry technology, weighing 1500kg without the generator, it’s easily towed. Setup is 30 minutes from taking of the travel/storage cover, to dumping the first load. Cleanups are a breeze with the BME patented wet/dry concentration system. The WORKDOG prototype was put through its paces in october 2025, after a brutal 3 week test, the WORKDOG was producing the target gold haul per cubic meter. In May 2026 the WORKDOG will be reviewed by an independent miner on YouTube.
Description:
20 cubic m/hour Processing power. Utilising BME wet/dry technology, weighing in at 3500kg with an 850kg generator. The bulldog is currently being built, incorporating all the lessons learnt from the WORKDOG test. The BULLDOG is expected to arrive at the central Queensland goldfields in May 2026.